ITAC Assessment: LE0163
ITAC logo
ITAC Assessment: LE0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Coal Tar Pitch
NAICS 325110: Petrochemical Manufacturing
SIC 2865: Cyclic Organic Crudes and Intermediates, and Organic Dyes and Pigments
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 610,000
ft2
Annual Production 5,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,495 1,946,100
kWh
Electricity Demand $46,616 3,875
kW-mo/yr
Natural Gas $52,253 6,291
MMBtu
Fuel Oil #2 $500,000 70,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.2511: Insulate bare equipment $16,944 $40,000 - - $16,944
-
MMBtu
02 2.2511: Insulate bare equipment $11,718 $9,072 - - $11,718
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $5,429 $1,434 - - $5,429
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,773 - $1,127
20,126
kWh
$646
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,258 - $751
13,417
kWh
$507
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,122 $50,506 $1,878
33,543
kWh
$1,153
-
kW-mo/yr
$34,091
-
MMBtu
TOTAL IMPLEMENTED $7,202 $1,434 $1,127
20,126
kWh
$646
-
kW-mo/yr
$5,429
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs