Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

621

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Asphalt paving, roofing, and saturated materials manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1164 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $966 $1,847
OK1164 #03 Y:2025 Clean and maintain refrigerant condensers and towers $566 $780
OK1164 #02 Y:2025 Replace existing hvac unit with high efficiency model $1,105 $3,355
OK1164 #01 Y:2025 Use solar heat to make electricty $201,784 $2,044,800
OR0820 #04 Y:2025 Redesign flow to minimize mass transfer length $12,313 $87,500
OR0820 #03 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $2,066 $629
OR0820 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,677 $982
OR0820 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,825 -
UC2515 #07 Y:2025 Use or replace with energy efficient substitutes $3,927 $15,750
UC2515 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,176 -
UC2515 #05 Y:2025 Keep solid fuels / raw materials dry $23,748 $104,000
UC2515 #04 Y:2025 Change rate schedules or other changes in utility service $102,262 $420,000
UC2515 #03 Y:2025 Use solar heat to make electricty $25,271 $169,615
UC2515 #02 Y:2025 Insulate bare equipment $19,982 $9,655
UC2515 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $677 $370
OR0817 #03 Y:2025 Use solar heat to make electricty $42,138 $218,000
OR0817 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,046 $1,106
OR0817 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,616 -
DL0263 #07 Y:2025 Condense operation into one building $50,314 $180,000
DL0263 #06 Y:2025 Replace obsolete burners with more efficient ones $9,146 $90,000