Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Petroleum refineries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0532 #05 Y:2016 Use most efficient type of electric motors $9,383 $14,410
SD0532 #04 Y:2016 Eliminate or reduce compressed air usage $13,093 $1,200
SD0532 #03 Y:2016 Re-use or recycle hot or cold process exhaust air $40,203 $13,575
SD0532 #02 Y:2016 Use waste heat from hot flue gases to preheat $46,280 $13,575
SD0532 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $872,947 $2,778,600
AM0628 #09 Y:2012 Use synthetic lubricant $240 -
AM0628 #08 Y:2012 Utilize daylight whenever possible in lieu of artificial light $520 -
AM0628 #07 Y:2012 Insulate feedwater tank $820 $455
AM0628 #06 Y:2012 Install skylights $1,525 -
AM0628 #05 Y:2012 Reduce the pressure of compressed air to the minimum required $2,870 $35
AM0628 #04 Y:2012 Install skylights $3,300 $5,300
AM0628 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,960 $20
AM0628 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $6,150 $11,100
AM0628 #01 Y:2012 Analyze flue gas for proper air/fuel ratio $15,700 $675
UMS001 #04 Y:2011 Adjust burners for efficient operation $13,000 $15,000
UMS001 #03 Y:2011 Use waste heat from hot flue gases to preheat $938,000 $1,000,000
UMS001 #02 Y:2011 Reduce combustion air flow to optimum $782,000 $1,377,000
UMS001 #01 Y:2011 Analyze flue gas for proper air/fuel ratio $986,100 $900,000
UF0423 #17 Y:2009 Improve air circulation with destratification fans / other methods $68,520 $24,901
UF0423 #16 Y:2009 Utilize higher efficiency lamps and/or ballasts $4,288 $506