Assessment Year | 2009 |
---|---|
Principal Product | thermoplastic elastomer pellets |
NAICS | 324110: Petroleum Refineries |
SIC | 5162: Plastics Materials and Basic Forms and Shapes |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
152,919
ft2
|
Annual Production | 1,200,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,107,473 | 39,299,809 |
kWh
|
$0.079 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $568,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,422 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $7,135 | $12,571 |
$7,135
90,311
kWh
|
- | - | - | |
02 | 2.2211: Use optimum temperature | $45,100 | - |
$45,100
-
kWh
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,442 | $600 |
$1,442
18,256
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,606 | $38,839 |
$31,606
400,075
kWh
|
- | - | - | |
05 | 2.5194: Redesign process | $206,074 | $300,000 |
$206,074
2,608,532
kWh
|
- | - | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $753 | - |
$753
9,537
kWh
|
- | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,505 | $2,503 |
$5,505
69,688
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $495 | $315 |
$495
6,266
kWh
|
- | - | - | |
09 | 3.5318: Recycle fluorescent lamps | $2,671 | $3,405 | - | - |
$2,671
-
lb
|
- | |
10 | 2.7141: Lower light fixtures in high ceiling areas | $1,109 | $283 |
$1,109
14,040
kWh
|
- | - | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,767 | $1,301 |
$15,767
199,586
kWh
|
- | - | - | |
12 | 2.2511: Insulate bare equipment | $159,410 | $5,591 |
$159,410
2,017,847
kWh
|
- | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,000 | - | - |
$7,000
-
lb
|
- | - | |
14 | 2.4151: Develop a repair/replace policy | $3,460 | - |
$3,460
40,124
kWh
|
- | - | - | |
15 | 3.521: General | $8,403 | $1,164 |
$8,403
106,363
kWh
|
- | - | - | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,288 | $506 |
$4,288
54,277
kWh
|
- | - | - | |
17 | 2.7243: Improve air circulation with destratification fans / other methods | $68,520 | $24,901 | - | - | - | $68,520 | |
TOTAL RECOMMENDED | $568,738 | $391,979 |
$490,547
5,634,902
kWh
|
$7,000
-
lb
|
$2,671
-
lb
|
$68,520 | ||
TOTAL IMPLEMENTED | $21,422 | $1,901 |
$21,422
267,503
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Increase in Production Savings |