ITAC Assessment: KU0062
ITAC logo
ITAC Assessment: KU0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FABRICATED FIRE SPRINKLE
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 2,575
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,673 264,361
kWh
Natural Gas $5,672 1,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,547 $2,445 $1,547
20,809
kWh
-
02 2.7261: Install timers and/or thermostats $1,446 $800 $1,220
16,413
kWh
$226
-
MMBtu
03 2.1123: Install automatic stack damper $485 $576 - $485
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $370 $272 - $370
-
MMBtu
TOTAL RECOMMENDED $3,848 $4,093 $2,767
37,222
kWh
$1,081
-
MMBtu
TOTAL IMPLEMENTED $370 $272 - $370
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs