ITAC Assessment: UD0118
ITAC logo
ITAC Assessment: UD0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product JUVENILE FURNITURE
NAICS
n/a
SIC 2514: Metal Household Furniture
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,635 4,057,444
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,495 - $3,495
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,336 $335 $1,336
24,619
kWh
-
03 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,044 - $3,044
70,340
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,598 $126,000 $51,128
1,100,234
kWh
$(-26,530.0)
-
MMBtu
TOTAL RECOMMENDED $32,473 $126,335 $59,003
1,195,193
kWh
$(-26,530.0)
-
MMBtu
TOTAL IMPLEMENTED $4,831 $335 $4,831
24,619
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs