Assessment Year | 2016 |
---|---|
Principal Product | Refined Oil Products |
NAICS | 324110: Petroleum Refineries |
SIC | 2911: Petroleum Refining |
Sales Range | $100 M to 500M |
# of Employees | 75 |
Plant Area |
340,000
ft2
|
Annual Production | 125,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,002,651 | 13,535,960 |
kWh
|
$0.074 |
Electricity Demand | $406,880 | 27,344 |
kW-mo/yr
|
$14.88 |
Electricity Fees | $19,224 | - |
|
- |
Natural Gas | $635,642 | 734,494 |
MMBtu
|
$0.87 |
TOTAL YEARLY COSTS | $2,064,397 | |||
RECOMMENDED SAVINGS* | $984,434 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $872,947 | $2,778,600 |
$659,573
12,191,730
kWh
|
$261,590
-
kW-mo/yr
|
$(-48,216.0)
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $46,280 | $13,575 | - | - |
$46,280
-
MMBtu
|
|
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $40,203 | $13,575 | - | - |
$40,203
-
MMBtu
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $13,093 | $1,200 |
$10,269
138,585
kWh
|
$2,824
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $9,383 | $14,410 |
$7,328
98,890
kWh
|
$2,055
-
kW-mo/yr
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $2,528 | $1,000 | - | - |
$2,528
-
MMBtu
|
|
TOTAL RECOMMENDED | $984,434 | $2,822,360 |
$677,170
12,429,205
kWh
|
$266,469
-
kW-mo/yr
|
$40,795
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs