ITAC Assessment: NL0072
ITAC logo
ITAC Assessment: NL0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Anhydrous Ammonia
NAICS 325311: Nitrogenous Fertilizer Manufacturing
SIC 2873: Nitrogenous Fertilizers
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area 1,655,000
ft2
Annual Production 38,325
ton
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,025,068 37,575,796
kWh
Electricity Demand $410,642 163,972
kW-mo/yr
Electricity Fees $185,455 -
Natural Gas $4,963,063 1,333,862
MMBtu
Waste Disposal Costs
Water Usage $648 21
Tgal
Water Disposal $855 21
Tgal
Other Liquid (non-haz) $484 10,080,000
gal
TOTAL YEARLY COSTS $6,586,215
RECOMMENDED SAVINGS* $34,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.1224: Replace boiler $18,966 $23,925 $5,137
188,180
kWh
$13,795
-
MMBtu
$34
-
gal
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,761 $20,400 $3,659
134,028
kWh
- - $420 $3,700 - $4,982
03 2.2128: Use steam condensate for hot water supply (non-potable) $2,055 $266 - $1,693
-
MMBtu
- - - $362 -
04 2.4221: Install compressor air intakes in coolest locations $773 $1,445 $773
28,324
kWh
- - - - - -
TOTAL RECOMMENDED $34,555 $46,036 $9,569
350,532
kWh
$15,488
-
MMBtu
$34
-
gal
$420 $3,700 $362 $4,982
TOTAL IMPLEMENTED $33,782 $44,591 $8,796
322,208
kWh
$15,488
-
MMBtu
$34
-
gal
$420 $3,700 $362 $4,982
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs