| Assessment Year | 2013 |
|---|---|
| Principal Product | Solid and liquid petrochemical blending and packaging |
| NAICS | 324110: Petroleum Refineries |
| SIC | 2865: Cyclic Organic Crudes and Intermediates, and Organic Dyes and Pigments |
| Sales Range | $10 M to 50M |
| # of Employees | 91 |
| Plant Area |
72,500
ft2
|
| Annual Production | 150,000,000
lb
|
| Production Hrs. Annual | 4,608
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $77,651 | 1,254,402 |
kWh
|
$0.062 |
| Electricity Demand | $38,121 | 6,143 |
kW-mo/yr
|
$6.21 |
| Electricity Fees | $6,418 | - |
|
- |
| Natural Gas | $183,664 | 33,744 |
MMBtu
|
$5.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,085 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,825 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,700 | $675 | - | - |
$15,700
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,150 | $11,100 |
$4,760
71,000
kWh
|
$1,390
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,960 | $20 |
$2,400
35,900
kWh
|
$560
-
kW-mo/yr
|
- | |
| 04 | 2.7145: Install skylights | $3,300 | $5,300 |
$3,300
49,300
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,870 | $35 |
$2,330
34,700
kWh
|
$540
-
kW-mo/yr
|
- | |
| 06 | 2.7145: Install skylights | $1,525 | - |
$1,525
22,770
kWh
|
- | - | |
| 07 | 2.2123: Insulate feedwater tank | $820 | $455 | - | - |
$820
-
MMBtu
|
|
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $520 | - |
$390
5,840
kWh
|
$130
-
kW-mo/yr
|
- | |
| 09 | 2.4314: Use synthetic lubricant | $240 | - |
$190
2,900
kWh
|
$50
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $34,085 | $17,585 |
$14,895
222,410
kWh
|
$2,670
-
kW-mo/yr
|
$16,520
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,825 | $6,450 |
$7,615
113,810
kWh
|
$690
-
kW-mo/yr
|
$16,520
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs