Assessment Year | 2009 |
---|---|
Principal Product | HVAC Components |
NAICS | 334512: Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use |
SIC | 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances |
Sales Range | $10 M to 50M |
# of Employees | 480 |
Plant Area |
186,000
ft2
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $379,068 | 7,882,492 |
kWh
|
$0.048 |
Electricity Demand | $333,171 | 13,347 |
kW-mo/yr
|
$24.96 |
Electricity Fees | $73,158 | - |
|
- |
Natural Gas | $292,047 | 24,949 |
MMBtu
|
$11.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $375,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,603 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $202,240 | $400,000 |
$3,383
5,760
kWh
|
$216,576
-
kW-mo/yr
|
- |
$(-12,719.0)
-
MMBtu
|
- | $(-5,000.0) | - | |
02 | 2.3113: Make ice during off peak hours for cooling | $51,343 | $72,000 |
$(-244.0)
(-4,160)
kWh
|
$52,587
-
kW-mo/yr
|
- | - | - | $(-1,000.0) | - | |
03 | 2.7233: Use properly designed and sized hvac equipment | $44,613 | $45,000 |
$27,355
465,740
kWh
|
$17,258
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $21,000 | $25,000 |
$21,000
357,591
kWh
|
- | - | - | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $8,105 | $7,000 | - | - |
$8,105
-
MMBtu
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,447 | $100 |
$1,439
24,506
kWh
|
$908
-
kW-mo/yr
|
- | - | $(-600.0) | - | $(-300.0) | |
07 | 2.4151: Develop a repair/replace policy | $2,019 | $2,198 |
$848
14,436
kWh
|
$1,171
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $44,156 | $85,555 |
$19,683
335,120
kWh
|
$27,195
-
kW-mo/yr
|
- | - | $(-4,142.0) | - | $1,420 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $712 | $351 |
$295
5,095
kWh
|
$417
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $375,635 | $637,204 |
$73,759
1,204,088
kWh
|
$316,112
-
kW-mo/yr
|
$8,105
-
MMBtu
|
$(-12,719.0)
-
MMBtu
|
$(-4,742.0) | $(-6,000.0) | $1,120 | ||
TOTAL IMPLEMENTED | $45,603 | $85,655 |
$21,122
359,626
kWh
|
$28,103
-
kW-mo/yr
|
- | - | $(-4,742.0) | - | $1,120 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs