Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,410

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0097 #07 Y:2005 Install common header on compressors $1,960 $2,900
UU0097 #06 Y:2005 Upgrade controls on compressors $2,770 $1,500
UU0097 #05 Y:2005 Install compressor air intakes in coolest locations $1,191 $740
UU0097 #04 Y:2005 Recover waste heat from equipment $7,461 $4,840
UU0097 #03 Y:2005 Analyze flue gas for proper air/fuel ratio $6,790 $2,000
UU0097 #02 Y:2005 Install an uninteruptable power supply $177,372 $808,858
UU0097 #01 Y:2005 Use demand controller or load shedder $58,512 $25,405
AM0501 #06 Y:2005 Use synthetic lubricant $650 -
AM0501 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,370 $1,000
AM0501 #04 Y:2005 Analyze flue gas for proper air/fuel ratio $2,370 $500
AM0501 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,800 $6,380
AM0501 #02 Y:2005 Reduce the pressure of compressed air to the minimum required $7,130 $105
AM0501 #01 Y:2005 Repair or replace steam traps $13,010 $390
TA0108 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $17,530 $11,050
TA0108 #05 Y:2005 Use minimum safe oven ventilation $300 -
TA0108 #04 Y:2005 Turn off equipment when not in use $1,590 -
TA0108 #03 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,647 $120
TA0108 #02 Y:2005 Insulate bare equipment $2,910 $495
TA0108 #01 Y:2005 Optimize plant power factor $11,100 $22,000
UM0290 #07 Y:2005 Close holes and openings in building such as broken windows $365 $720