ITAC Assessment: AM0501
ITAC logo
ITAC Assessment: AM0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product corrugated shipping containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 161
Plant Area 327,000
ft2
Annual Production 75,325
ton
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,640 10,128,744
kWh
Electricity Demand $140,444 19,152
kW-mo/yr
Electricity Fees $48,264 -
Natural Gas $579,346 75,828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $13,010 $390 - - $13,010
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,130 $105 $4,890
135,700
kWh
$2,240
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,800 $6,380 $1,920
53,500
kWh
$880
-
kW-mo/yr
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,370 $500 - - $2,370
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,370 $1,000 $230
6,400
kWh
$70
-
kW-mo/yr
- $1,000 $1,070
06 2.4314: Use synthetic lubricant $650 - $380
10,590
kWh
$270
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $28,330 $8,375 $7,420
206,190
kWh
$3,460
-
kW-mo/yr
$15,380
-
MMBtu
$1,000 $1,070
TOTAL IMPLEMENTED $24,880 $1,995 $5,120
142,100
kWh
$2,310
-
kW-mo/yr
$15,380
-
MMBtu
$1,000 $1,070
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs