Assessment Year | 2005 |
---|---|
Principal Product | Cardboard boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
500,000
ft2
|
Annual Production | 1,524,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $403,150 | 12,599,100 |
kWh
|
$0.032 |
Electricity Demand | $190,746 | 26,046 |
kW-mo/yr
|
$7.32 |
Natural Gas | $403,585 | 151,032 |
MMBtu
|
$2.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $329,757 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $58,512 | $25,405 | - |
$58,512
-
kW-mo/yr
|
- | - | |
02 | 4.631: Install an uninteruptable power supply | $177,372 | $808,858 | - | - | - | $177,372 | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,790 | $2,000 | - | - |
$6,790
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $7,461 | $4,840 | - | - |
$7,461
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,191 | $740 |
$714
23,200
kWh
|
$477
-
kW-mo/yr
|
- | - | |
06 | 2.4224: Upgrade controls on compressors | $2,770 | $1,500 |
$2,770
90,000
kWh
|
- | - | - | |
07 | 2.4225: Install common header on compressors | $1,960 | $2,900 |
$1,960
63,800
kWh
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,113 | $3,570 |
$2,113
68,700
kWh
|
- | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $71,588 | $180,000 |
$71,588
2,328,000
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $329,757 | $1,029,813 |
$79,145
2,573,700
kWh
|
$58,989
-
kW-mo/yr
|
$14,251
-
MMBtu
|
$177,372 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs