Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paperboard mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0037 #05 Y:2024 Apply for investment incentives $94,336 $5,000
NT0037 #04 Y:2024 Lower temperature during the winter season and vice-versa $482 -
NT0037 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $5,316 -
NT0037 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,403 $5,609
NT0037 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $577 $1,901
NT0029 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,550 $21,900
NT0029 #04 Y:2024 Apply for investment incentives $204,971 $10,000
NT0029 #03 Y:2024 Optimize plant power factor $34,386 $117,351
NT0029 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,227 $1,819
NT0029 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,179 $5,609
IP0145 #05 Y:2021 Recover waste heat from equipment $4,611 $17,283
IP0145 #04 Y:2021 Use steam pressure reduction to generate power $213,186 $665,875
IP0145 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $15,236 $12,797
IP0145 #02 Y:2021 Upgrade controls on compressors $24,768 $21,741
IP0145 #01 Y:2021 Use waste heat from hot flue gases to preheat $88,444 $27,000
AM0787 #08 Y:2019 Reduce illumination to minimum necessary levels $399 $280
AM0787 #07 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,577 $2,640
AM0787 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $2,322 $825
AM0787 #05 Y:2019 Optimize plant power factor $70,814 $178,864
AM0787 #04 Y:2019 Use synthetic lubricant $13,271 $14,560