| Assessment Year | 2019 |
|---|---|
| Principal Product | Clay coated and chip paperboard |
| NAICS | 322130: Paperboard Mills |
| SIC | 2631: Paperboard Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 95 |
| Plant Area |
170,000
ft2
|
| Annual Production | 124,000
units
|
| Production Hrs. Annual | 8,712
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,338,100 | 55,519,380 |
kWh
|
$0.042 |
| Electricity Demand | $735,222 | 97,780 |
kW-mo/yr
|
$7.52 |
| Electricity Fees | $3,140,978 | - |
|
- |
| Natural Gas | $1,927,192 | 1,280,254 |
MMBtu
|
$1.51 |
| TOTAL YEARLY COSTS | $8,141,493 | |||
| RECOMMENDED SAVINGS* | $747,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $144,579 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3321: Use steam pressure reduction to generate power | $290,927 | $1,011,274 |
$290,927
8,241,552
kWh
|
- | - | |
| 02 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $312,044 | $849,614 |
$312,044
6,915,582
kWh
|
- | - | |
| 03 | 2.2113: Repair or replace steam traps | $56,595 | $10,440 | - | - |
$56,595
-
MMBtu
|
|
| 04 | 2.4314: Use synthetic lubricant | $13,271 | $14,560 |
$10,525
250,589
kWh
|
$2,746
-
kW-mo/yr
|
- | |
| 05 | 2.3212: Optimize plant power factor | $70,814 | $178,864 | - |
$70,814
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,322 | $825 |
$2,322
55,287
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,577 | $2,640 |
$1,036
24,672
kWh
|
$541
-
kW-mo/yr
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $399 | $280 |
$264
6,284
kWh
|
$135
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $747,949 | $2,068,497 |
$617,118
15,493,966
kWh
|
$74,236
-
kW-mo/yr
|
$56,595
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $144,579 | $207,329 |
$13,883
330,548
kWh
|
$74,101
-
kW-mo/yr
|
$56,595
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs