723
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA0234 #03 Y:2020 | 03 | 2020 | Utilize higher efficiency lamps and/or ballasts | $638 | $850 | |
| UA0234 #02 Y:2020 | 02 | 2020 | Optimize plant power factor | $1,608 | $7,769 | |
| UA0234 #01 Y:2020 | 01 | 2020 | Modify startup/shutdown times | $17,505 | - | |
| MA0819 #04 Y:2020 | 04 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $6,721 | $2,930 | |
| MA0819 #03 Y:2020 | 03 | 2020 | Reschedule plant operations or reduce load to avoid peaks | $18,833 | $1,000 | |
| MA0819 #02 Y:2020 | 02 | 2020 | Replace electrically-operated equipment with fossil fuel equipment | $28,022 | $217,000 | |
| MA0819 #01 Y:2020 | 01 | 2020 | Use or replace with energy efficient substitutes | $21,315 | $92,400 | |
| LS1917 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $13,652 | $49,919 | |
| LS1917 #05 Y:2019 | 05 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $132,076 | $93,000 | |
| LS1917 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,391 | - | |
| LS1917 #03 Y:2019 | 03 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $3,748 | $535 | |
| LS1917 #02 Y:2019 | 02 | 2019 | Utilize controls to operate equipment only when needed | $4,335 | $175 | |
| LS1917 #01 Y:2019 | 01 | 2019 | Pay utility bills on time | $27,657 | - | |
| AM0787 #08 Y:2019 | 08 | 2019 | Reduce illumination to minimum necessary levels | $399 | $280 | |
| AM0787 #07 Y:2019 | 07 | 2019 | Utilize higher efficiency lamps and/or ballasts | $1,577 | $2,640 | |
| AM0787 #06 Y:2019 | 06 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,322 | $825 | |
| AM0787 #05 Y:2019 | 05 | 2019 | Optimize plant power factor | $70,814 | $178,864 | |
| AM0787 #04 Y:2019 | 04 | 2019 | Use synthetic lubricant | $13,271 | $14,560 | |
| AM0787 #03 Y:2019 | 03 | 2019 | Repair or replace steam traps | $56,595 | $10,440 | |
| AM0787 #02 Y:2019 | 02 | 2019 | Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $312,044 | $849,614 |