Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

723

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pulp, paper, and paperboard mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0234 #03 Y:2020 Utilize higher efficiency lamps and/or ballasts $638 $850
UA0234 #02 Y:2020 Optimize plant power factor $1,608 $7,769
UA0234 #01 Y:2020 Modify startup/shutdown times $17,505 -
MA0819 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $6,721 $2,930
MA0819 #03 Y:2020 Reschedule plant operations or reduce load to avoid peaks $18,833 $1,000
MA0819 #02 Y:2020 Replace electrically-operated equipment with fossil fuel equipment $28,022 $217,000
MA0819 #01 Y:2020 Use or replace with energy efficient substitutes $21,315 $92,400
LS1917 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $13,652 $49,919
LS1917 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $132,076 $93,000
LS1917 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $3,391 -
LS1917 #03 Y:2019 Utilize energy-efficient belts and other improved mechanisms $3,748 $535
LS1917 #02 Y:2019 Utilize controls to operate equipment only when needed $4,335 $175
LS1917 #01 Y:2019 Pay utility bills on time $27,657 -
AM0787 #08 Y:2019 Reduce illumination to minimum necessary levels $399 $280
AM0787 #07 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,577 $2,640
AM0787 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $2,322 $825
AM0787 #05 Y:2019 Optimize plant power factor $70,814 $178,864
AM0787 #04 Y:2019 Use synthetic lubricant $13,271 $14,560
AM0787 #03 Y:2019 Repair or replace steam traps $56,595 $10,440
AM0787 #02 Y:2019 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $312,044 $849,614