ITAC Assessment: MA0819
ITAC logo
ITAC Assessment: MA0819
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 30
Plant Area 230,000
ft2
Annual Production 33,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,388 2,373,122
kWh
Electricity Demand $158,915 29,954
kW-mo/yr
Electricity Fees $(-85.0) -
Natural Gas $3,899,549 480,369
MMBtu
Waste Disposal Costs
Water Usage $219,287 24,980
Tgal
TOTAL YEARLY COSTS $4,627,054
RECOMMENDED SAVINGS* $74,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.4322: Use or replace with energy efficient substitutes $21,315 $92,400 $17,796
121,062
kWh
$886
-
kW-mo/yr
- $2,633
-
Tgal
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,022 $217,000 $23,825
162,076
kWh
$7,103
-
kW-mo/yr
$(-2,906.0)
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,833 $1,000 - $18,833
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,721 $2,930 $6,403
43,560
kWh
$318
-
kW-mo/yr
- -
TOTAL RECOMMENDED $74,891 $313,330 $48,024
326,698
kWh
$27,140
-
kW-mo/yr
$(-2,906.0)
-
MMBtu
$2,633
-
Tgal
TOTAL IMPLEMENTED $28,022 $217,000 $23,825
162,076
kWh
$7,103
-
kW-mo/yr
$(-2,906.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs