Assessment Year | 2020 |
---|---|
Principal Product | Specialty paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $100 M to 500M |
# of Employees | 30 |
Plant Area |
230,000
ft2
|
Annual Production | 33,000,000
lb
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $349,388 | 2,373,122 |
kWh
|
$0.15 | |
Electricity Demand | $158,915 | 29,954 |
kW-mo/yr
|
$5.31 | |
Electricity Fees | $(-85.0) | - |
|
- | |
Natural Gas | $3,899,549 | 480,369 |
MMBtu
|
$8.12 | |
Waste Disposal Costs | |||||
Water Usage | $219,287 | 24,980 |
Tgal
|
$8.78 | |
TOTAL YEARLY COSTS | $4,627,054 | ||||
RECOMMENDED SAVINGS* | $74,891 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $28,022 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $21,315 | $92,400 |
$17,796
121,062
kWh
|
$886
-
kW-mo/yr
|
- |
$2,633
-
Tgal
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $28,022 | $217,000 |
$23,825
162,076
kWh
|
$7,103
-
kW-mo/yr
|
$(-2,906.0)
-
MMBtu
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,833 | $1,000 | - |
$18,833
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,721 | $2,930 |
$6,403
43,560
kWh
|
$318
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $74,891 | $313,330 |
$48,024
326,698
kWh
|
$27,140
-
kW-mo/yr
|
$(-2,906.0)
-
MMBtu
|
$2,633
-
Tgal
|
||
TOTAL IMPLEMENTED | $28,022 | $217,000 |
$23,825
162,076
kWh
|
$7,103
-
kW-mo/yr
|
$(-2,906.0)
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs