ITAC Assessment: OK0688
ITAC logo
ITAC Assessment: OK0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area 20,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,754 1,555,200
kWh
Electricity Fees $9,869 -
Natural Gas $46,492 6,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $12,973 - - $12,973 - - -
02 2.7241: Install outside air damper / economizer on hvac unit $3,034 $2,400 $3,034
40,832
kWh
- - - -
03 2.2511: Insulate bare equipment $7,575 $3,782 - - $7,575
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,211 $535 $6,379
85,863
kWh
- - $(-168.0) -
05 2.4222: Install adequate dryers on air lines to eliminate blowdown $2,882 $3,690 $2,882
38,792
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $763 $5,444 $1,088
14,667
kWh
- - - $(-325.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $464 $745 $247
3,329
kWh
- - $217 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $1,846 $657
8,840
kWh
- - $(-107.0) -
TOTAL RECOMMENDED $34,453 $18,442 $14,288
192,323
kWh
$12,973 $7,575
-
MMBtu
$(-58.0) $(-325.0)
TOTAL IMPLEMENTED $20,252 $12,253 $12,952
174,327
kWh
- $7,575
-
MMBtu
$(-275.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs