| Assessment Year | 2004 |
|---|---|
| Principal Product | Castings |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $1 M to 5M |
| # of Employees | 36 |
| Plant Area |
20,000
ft2
|
| Annual Production | 18,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,754 | 1,555,200 |
kWh
|
$0.068 |
| Electricity Fees | $9,869 | - |
|
- |
| Natural Gas | $46,492 | 6,375 |
MMBtu
|
$7.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,453 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,252 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $12,973 | - | - | $12,973 | - | - | - | |
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $3,034 | $2,400 |
$3,034
40,832
kWh
|
- | - | - | - | |
| 03 | 2.2511: Insulate bare equipment | $7,575 | $3,782 | - | - |
$7,575
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,211 | $535 |
$6,379
85,863
kWh
|
- | - | $(-168.0) | - | |
| 05 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $2,882 | $3,690 |
$2,882
38,792
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $763 | $5,444 |
$1,088
14,667
kWh
|
- | - | - | $(-325.0) | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $464 | $745 |
$247
3,329
kWh
|
- | - | $217 | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $550 | $1,846 |
$657
8,840
kWh
|
- | - | $(-107.0) | - | |
| TOTAL RECOMMENDED | $34,453 | $18,442 |
$14,288
192,323
kWh
|
$12,973 |
$7,575
-
MMBtu
|
$(-58.0) | $(-325.0) | ||
| TOTAL IMPLEMENTED | $20,252 | $12,253 |
$12,952
174,327
kWh
|
- |
$7,575
-
MMBtu
|
$(-275.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs