ITAC Assessment: LS1917
ITAC logo
ITAC Assessment: LS1917
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range less than $500
k
# of Employees 300
Plant Area 1,093,060
ft2
Annual Production 375,650
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,121,898 211,808,000
kWh
Electricity Demand $2,198,514 306,802
kW-mo/yr
Electricity Fees $27,657 -
Natural Gas $5,951,358 1,919,054
MMBtu
TOTAL YEARLY COSTS $17,299,427
RECOMMENDED SAVINGS* $184,859 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8123: Pay utility bills on time $27,657 - - - $27,657
02 2.6231: Utilize controls to operate equipment only when needed $4,335 $175 $4,335
100,660
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,748 $535 $3,748
87,024
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,391 - $3,391
78,729
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $132,076 $93,000 $132,076
3,066,763
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,652 $49,919 $10,274
238,566
kWh
$3,378
-
kW-mo/yr
-
TOTAL RECOMMENDED $184,859 $143,629 $153,824
3,571,742
kWh
$3,378
-
kW-mo/yr
$27,657
TOTAL IMPLEMENTED $44,700 $49,919 $13,665
317,295
kWh
$3,378
-
kW-mo/yr
$27,657
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs