Assessment Year | 2025 |
---|---|
Principal Product | Appliance Insulation Fabrication |
NAICS | 327993: Mineral Wool Manufacturing |
SIC | 3296: Mineral Wool |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
120,000
ft2
|
Annual Production | 250,000
ton
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $77,184 | 779,444 |
kWh
|
$0.099 | |
Natural Gas | $17,117 | 2,400 |
MMBtu
|
$7.13 | |
Waste Disposal Costs | |||||
Water Usage | $1,236 | 729 |
Tgal
|
$1.70 | |
Water Disposal | $9,984 | 729 |
Tgal
|
$13.70 | |
TOTAL YEARLY COSTS | $105,521 | ||||
RECOMMENDED SAVINGS* | $18,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $726 | $30 |
$726
7,260
kWh
|
- | |
02 | 2.6218: Turn off equipment when not in use | $1,541 | $120 |
$1,541
15,565
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,989 | $960 |
$2,989
27,984
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,645 | $1,825 |
$5,645
52,856
kWh
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,283 | $1,000 |
$2,283
22,833
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $206 | $200 |
$206
2,056
kWh
|
- | |
07 | 2.2437: Recover waste heat from equipment | $867 | $3,000 | - |
$867
-
MMBtu
|
|
08 | 4.721: Initiate a program to acquire iso certification | $3,379 | $15,000 |
$2,746
28,839
kWh
|
$633
-
MMBtu
|
|
09 | 2.4224: Upgrade controls on compressors | $1,012 | $5,000 |
$1,012
10,120
kWh
|
- | |
TOTAL RECOMMENDED | $18,648 | $27,135 |
$17,147
167,513
kWh
|
$1,500
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs