ITAC Assessment: TT0332
ITAC logo
ITAC Assessment: TT0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Appliance Insulation Fabrication
NAICS 327993: Mineral Wool Manufacturing
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 120,000
ft2
Annual Production 250,000
ton
Production Hrs. Annual 4,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,184 779,444
kWh
Natural Gas $17,117 2,400
MMBtu
Waste Disposal Costs
Water Usage $1,236 729
Tgal
Water Disposal $9,984 729
Tgal
TOTAL YEARLY COSTS $105,521
RECOMMENDED SAVINGS* $18,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $726 $30 $726
7,260
kWh
-
02 2.6218: Turn off equipment when not in use $1,541 $120 $1,541
15,565
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,989 $960 $2,989
27,984
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,645 $1,825 $5,645
52,856
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $2,283 $1,000 $2,283
22,833
kWh
-
06 2.6218: Turn off equipment when not in use $206 $200 $206
2,056
kWh
-
07 2.2437: Recover waste heat from equipment $867 $3,000 - $867
-
MMBtu
08 4.721: Initiate a program to acquire iso certification $3,379 $15,000 $2,746
28,839
kWh
$633
-
MMBtu
09 2.4224: Upgrade controls on compressors $1,012 $5,000 $1,012
10,120
kWh
-
TOTAL RECOMMENDED $18,648 $27,135 $17,147
167,513
kWh
$1,500
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs