390
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Other millwork (including flooring) | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
KS2427 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $45,498 | $453,376 |
n/a
|
KS2427 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $50,928 | $156,644 |
n/a
|
KS2427 #04 Y:2024 | 04 | 2024 | Use cooling tower or economizer to replace chiller cooling | $69,076 | $156,917 |
n/a
|
KS2427 #03 Y:2024 | 03 | 2024 | Use optimum thickness insulation | $9,550 | $6,688 |
n/a
|
KS2427 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $2,216 | $90 |
n/a
|
KS2427 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,324 | $5,480 |
n/a
|
NL0091 #05 Y:2023 | 05 | 2023 | Eliminate or reduce compressed air usage | $216 | $128 | |
NL0091 #04 Y:2023 | 04 | 2023 | Utilize higher efficiency lamps and/or ballasts | $507 | $1,064 | |
NL0091 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,370 | $1,500 | |
NL0091 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $16,289 | $11,473 | |
NL0091 #01 Y:2023 | 01 | 2023 | Improve air circulation with destratification fans / other methods | $28,330 | $57,285 | |
WV0655 #11 Y:2023 | 11 | 2023 | Eliminate or reduce compressed air usage | $324 | $359 | |
WV0655 #10 Y:2023 | 10 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,641 | $210 | |
WV0655 #09 Y:2023 | 09 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $4,005 | $7,828 | |
WV0655 #08 Y:2023 | 08 | 2023 | Develop a repair/replace policy | $4,078 | $12,517 | |
WV0655 #07 Y:2023 | 07 | 2023 | Optimize plant power factor | $6,154 | $4,905 | |
WV0655 #06 Y:2023 | 06 | 2023 | Insulate bare equipment | $8,192 | $5,240 | |
WV0655 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $11,873 | $10,662 | |
WV0655 #04 Y:2023 | 04 | 2023 | Upgrade controls on compressors | $11,948 | $11,050 | |
WV0655 #03 Y:2023 | 03 | 2023 | Establish a predictive maintenance program | $12,350 | $1,500 |