| Assessment Year | 2024 |
|---|---|
| Principal Product | Vinyl Flooring |
| NAICS | 321918: Other Millwork (including Flooring) |
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
300,000
ft2
|
| Annual Production | 19,000,000
units
|
| Production Hrs. Annual | 4,900
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,329,903 | 14,080,531 |
kWh
|
$0.094 | |
| Natural Gas | $607,384 | 92,004 |
MMBtu
|
$6.60 | |
| Waste Disposal Costs | |||||
| Water Usage | $19,724 | 2,605 |
Tgal
|
$7.57 | |
| Water Disposal | $19,724 | 2,605 |
Tgal
|
$7.57 | |
| TOTAL YEARLY COSTS | $1,976,735 | ||||
| RECOMMENDED SAVINGS* | $179,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,324 | $5,480 |
$2,324
24,723
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,216 | $90 |
$2,216
23,578
kWh
|
- | - | |
| 03 | 2.2515: Use optimum thickness insulation | $9,550 | $6,688 | - |
$9,550
-
MMBtu
|
- | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $69,076 | $156,917 |
$69,076
734,850
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50,928 | $156,644 |
$40,232
428,005
kWh
|
- | $10,696 | |
| 06 | 2.9114: Use solar heat to make electricty | $45,498 | $453,376 |
$45,498
484,024
kWh
|
- | - | |
| TOTAL RECOMMENDED | $179,592 | $779,195 |
$159,346
1,695,180
kWh
|
$9,550
-
MMBtu
|
$10,696 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs