Assessment Year | 2024 |
---|---|
Principal Product | Vinyl Flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
300,000
ft2
|
Annual Production | 19,000,000
units
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,329,903 | 14,080,531 |
kWh
|
$0.094 | |
Natural Gas | $607,384 | 92,004 |
MMBtu
|
$6.60 | |
Waste Disposal Costs | |||||
Water Usage | $19,724 | 2,605 |
Tgal
|
$7.57 | |
Water Disposal | $19,724 | 2,605 |
Tgal
|
$7.57 | |
TOTAL YEARLY COSTS | $1,976,735 | ||||
RECOMMENDED SAVINGS* | $179,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,324 | $5,480 |
$2,324
24,723
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,216 | $90 |
$2,216
23,578
kWh
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $9,550 | $6,688 | - |
$9,550
-
MMBtu
|
- | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $69,076 | $156,917 |
$69,076
734,850
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50,928 | $156,644 |
$40,232
428,005
kWh
|
- | $10,696 | |
06 | 2.9114: Use solar heat to make electricty | $45,498 | $453,376 |
$45,498
484,024
kWh
|
- | - | |
TOTAL RECOMMENDED | $179,592 | $779,195 |
$159,346
1,695,180
kWh
|
$9,550
-
MMBtu
|
$10,696 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs