ITAC Assessment: KS2427
ITAC logo
ITAC Assessment: KS2427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Vinyl Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 19,000,000
units
Production Hrs. Annual 4,900
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,329,903 14,080,531
kWh
Natural Gas $607,384 92,004
MMBtu
Waste Disposal Costs
Water Usage $19,724 2,605
Tgal
Water Disposal $19,724 2,605
Tgal
TOTAL YEARLY COSTS $1,976,735
RECOMMENDED SAVINGS* $179,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,324 $5,480 $2,324
24,723
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,216 $90 $2,216
23,578
kWh
- -
03 2.2515: Use optimum thickness insulation $9,550 $6,688 - $9,550
-
MMBtu
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $69,076 $156,917 $69,076
734,850
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $50,928 $156,644 $40,232
428,005
kWh
- $10,696
06 2.9114: Use solar heat to make electricty $45,498 $453,376 $45,498
484,024
kWh
- -
TOTAL RECOMMENDED $179,592 $779,195 $159,346
1,695,180
kWh
$9,550
-
MMBtu
$10,696
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs