Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,711

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0087 #03 Y:2016 Install compressor air intakes in coolest locations $1,873 $275
BS0087 #02 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $9,907 $27,896
BS0087 #01 Y:2016 Optimize plant power factor $32,576 $43,711
BS0084 #05 Y:2016 Insulate bare equipment $118 $264
BS0084 #04 Y:2016 Install timers on light switches in little used areas $751 $243
BS0084 #03 Y:2016 Install compressor air intakes in coolest locations $4,738 $825
BS0084 #02 Y:2016 Utilize controls to operate equipment only when needed $3,854 $15
BS0084 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $31,444 $31,350
BS0082 #06 Y:2016 Combine utility meters $63 $60
BS0082 #05 Y:2016 Redesign process $1,906 $1,953
BS0082 #04 Y:2016 Use or replace with energy efficient substitutes $366 $2,240
BS0082 #03 Y:2016 Utilize energy-efficient belts and other improved mechanisms $146 $300
BS0082 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,517 $2,325
BS0082 #01 Y:2016 Upgrade controls on compressors $1,327 $3,476
BD0487 #08 Y:2016 Make a new by-product $96,800 $50,000
BD0487 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $437 $748
BD0487 #06 Y:2016 Use waste heat from hot flue gases to preheat $581 $2,500
BD0487 #05 Y:2016 Adjust / maintain fork lift trucks for most efficient operation $658 $1,225
BD0487 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,019 $2,552
BD0487 #03 Y:2016 Reduce the pressure of compressed air to the minimum required $1,448 $20