ITAC Assessment: BS0082
ITAC logo
ITAC Assessment: BS0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Manufactured Homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 113,500
ft2
Annual Production 520
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,225 767,479
kWh
Electricity Demand $14,226 2,995
kW-mo/yr
Electricity Fees $869 -
Natural Gas $18,991 2,801
MMBtu
LPG $19,075 1,109
MMBtu
Fuel Oil #2 $3,120 176
MMBtu
TOTAL YEARLY COSTS $100,507
RECOMMENDED SAVINGS* $6,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $1,327 $3,476 $899
15,600
kWh
$428
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,517 $2,325 $2,517
43,680
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $146 $300 $98
1,700
kWh
$48
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $366 $2,240 $247
4,286
kWh
$119
-
kW-mo/yr
- -
05 2.5194: Redesign process $1,906 $1,953 - - $1,906
-
MMBtu
-
06 2.8112: Combine utility meters $63 $60 - - - $63
TOTAL RECOMMENDED $6,325 $10,354 $3,761
65,266
kWh
$595
-
kW-mo/yr
$1,906
-
MMBtu
$63
TOTAL IMPLEMENTED $5,896 $8,054 $3,514
60,980
kWh
$476
-
kW-mo/yr
$1,906
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs