ITAC Assessment: OK0882
ITAC logo
ITAC Assessment: OK0882
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Food Service Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 64,000
ft2
Annual Production 23,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,679 10,836,400
kWh
Electricity Demand $127,872 22,009
kW-mo/yr
Natural Gas $12,456 2,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $4,763 $1,400 $3,173
63,454
kWh
$1,591
-
kW-mo/yr
- -
02 2.7241: Install outside air damper / economizer on hvac unit $37,574 $29,200 $37,574
751,488
kWh
- - -
03 2.7261: Install timers and/or thermostats $8,378 $2,870 $8,169
163,374
kWh
- $209
-
MMBtu
-
04 2.6232: Install set-back timers $142 $170 - - $142
-
MMBtu
-
05 2.7211: Clean and maintain refrigerant condensers and towers $1,361 $28 $1,361
27,228
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $634 $2,940 $634
12,685
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,055 - $9,805
196,101
kWh
- - $(-1,750.0)
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,060 $1,025 $4,060
81,206
kWh
- - -
09 2.2437: Recover waste heat from equipment $3,908 $1,113 - - $3,908
-
MMBtu
-
10 2.6218: Turn off equipment when not in use $333 - $333
6,660
kWh
- - -
11 2.2691: Shut off cooling if cold outside air will cool process $5,834 $6,336 $5,834
116,672
kWh
- - -
TOTAL RECOMMENDED $75,043 $45,082 $70,943
1,418,868
kWh
$1,591
-
kW-mo/yr
$4,259
-
MMBtu
$(-1,750.0)
TOTAL IMPLEMENTED $9,157 $2,425 $7,566
151,320
kWh
$1,591
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs