Assessment Year | 2014 |
---|---|
Principal Product | Food Service Products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
64,000
ft2
|
Annual Production | 23,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $536,679 | 10,836,400 |
kWh
|
$0.050 |
Electricity Demand | $127,872 | 22,009 |
kW-mo/yr
|
$5.81 |
Natural Gas | $12,456 | 2,460 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,157 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7211: Clean and maintain refrigerant condensers and towers | $4,763 | $1,400 |
$3,173
63,454
kWh
|
$1,591
-
kW-mo/yr
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $37,574 | $29,200 |
$37,574
751,488
kWh
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $8,378 | $2,870 |
$8,169
163,374
kWh
|
- |
$209
-
MMBtu
|
- | |
04 | 2.6232: Install set-back timers | $142 | $170 | - | - |
$142
-
MMBtu
|
- | |
05 | 2.7211: Clean and maintain refrigerant condensers and towers | $1,361 | $28 |
$1,361
27,228
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $634 | $2,940 |
$634
12,685
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,055 | - |
$9,805
196,101
kWh
|
- | - | $(-1,750.0) | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,060 | $1,025 |
$4,060
81,206
kWh
|
- | - | - | |
09 | 2.2437: Recover waste heat from equipment | $3,908 | $1,113 | - | - |
$3,908
-
MMBtu
|
- | |
10 | 2.6218: Turn off equipment when not in use | $333 | - |
$333
6,660
kWh
|
- | - | - | |
11 | 2.2691: Shut off cooling if cold outside air will cool process | $5,834 | $6,336 |
$5,834
116,672
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $75,043 | $45,082 |
$70,943
1,418,868
kWh
|
$1,591
-
kW-mo/yr
|
$4,259
-
MMBtu
|
$(-1,750.0) | ||
TOTAL IMPLEMENTED | $9,157 | $2,425 |
$7,566
151,320
kWh
|
$1,591
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs