ITAC Assessment: KU0361
ITAC logo
ITAC Assessment: KU0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product INDUS. CLEANING PRODUCTS
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 9,000
Tgal
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,534 604,924
kWh
Natural Gas $20,533 4,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $1,475 $6,000 - $1,475
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $701 - $701
9,965
kWh
-
03 2.2437: Recover waste heat from equipment $375 $520 $(-41.0)
(-586)
kWh
$416
-
MMBtu
04 2.1232: Keep boiler tubes clean $275 $450 - $275
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $408 $480 - $408
-
MMBtu
06 2.6232: Install set-back timers $288 $330 $288
4,103
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $474 $350 $474
6,741
kWh
-
08 2.2437: Recover waste heat from equipment $832 $500 - $832
-
MMBtu
TOTAL RECOMMENDED $4,828 $8,630 $1,422
20,223
kWh
$3,406
-
MMBtu
TOTAL IMPLEMENTED $3,065 $2,300 $1,134
16,120
kWh
$1,931
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs