ITAC Assessment: TR0064
ITAC logo
ITAC Assessment: TR0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 1,045,440
ft2
Annual Production 1,800,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,305 1,224,190
kWh
Electricity Demand $11,631 2,918
kW-mo/yr
TOTAL YEARLY COSTS $102,936
RECOMMENDED SAVINGS* $31,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $2,594 $12,616 $2,417
32,405
kWh
$177
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $23,835 $156,628 $21,861
293,102
kWh
$1,975
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $4,926 $7,650 $4,589
61,531
kWh
$336
-
kW-mo/yr
TOTAL RECOMMENDED $31,355 $176,894 $28,867
387,038
kWh
$2,488
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs