ITAC Assessment: BD0487
ITAC logo
ITAC Assessment: BD0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Sporting Goods Handles
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 85
Plant Area 55,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,545 624,200
kWh
Electricity Demand $26,193 1,866
kW-mo/yr
Electricity Fees $408 -
Natural Gas $12,261 1,900
MMBtu
LPG $882 36
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $14,385 $50,000 $29,089
359,125
kWh
$27,378
-
kW-mo/yr
$(-40,082.0)
-
MMBtu
- $(-2,000.0) - -
02 2.7135: Install occupancy sensors $3,494 $825 $1,398
17,263
kWh
$2,096
-
kW-mo/yr
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,448 $20 $747
9,218
kWh
$701
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,019 $2,552 $525
6,484
kWh
$494
-
kW-mo/yr
- - - - -
05 2.8227: Adjust / maintain fork lift trucks for most efficient operation $658 $1,225 - - $(-224.0)
-
MMBtu
$882
-
MMBtu
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $581 $2,500 $(-119.0)
(-1,473)
kWh
$(-84.0)
-
kW-mo/yr
$784
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $437 $748 $195
2,408
kWh
$184
-
kW-mo/yr
- - $28 - $30
08 3.1182: Make a new by-product $96,800 $50,000 - - - - - $96,800 -
TOTAL RECOMMENDED $118,822 $107,870 $31,835
393,025
kWh
$30,769
-
kW-mo/yr
$(-39,522.0)
-
MMBtu
$882
-
MMBtu
$(-1,972.0) $96,800 $30
TOTAL IMPLEMENTED $581 $2,500 $(-119.0)
(-1,473)
kWh
$(-84.0)
-
kW-mo/yr
$784
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs