ITAC Assessment: BS0087
ITAC logo
ITAC Assessment: BS0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Dimensional Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 4,356,000
ft2
Annual Production 62,000
thousand feet
Production Hrs. Annual 2,510
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,116 11,816,400
kWh
Electricity Demand $193,269 35,664
kW-mo/yr
Electricity Fees $32,576 -
Natural Gas $2,751 308
MMBtu
TOTAL YEARLY COSTS $641,712
RECOMMENDED SAVINGS* $45,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $32,576 $43,711 - - $32,576
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,907 $27,896 $8,192
204,765
kWh
$1,715
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,873 $275 $1,217
30,421
kWh
$656
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $689 $5,040 $396
9,900
kWh
$293
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,045 $76,922 $9,804
245,086
kWh
$2,664
-
kW-mo/yr
$32,576
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs