ITAC Assessment: BS0084
ITAC logo
ITAC Assessment: BS0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Dimensional Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 155
Plant Area 448,246
ft2
Annual Production 52,000
thousand feet
Production Hrs. Annual 4,080
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,707 7,836,551
kWh
Electricity Demand $186,283 29,898
kW-mo/yr
LPG $42,000 7,278
MMBtu
TOTAL YEARLY COSTS $798,990
RECOMMENDED SAVINGS* $40,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $31,444 $31,350 $4,940
67,676
kWh
$1,598
-
kW-mo/yr
- $24,905
02 2.6231: Utilize controls to operate equipment only when needed $3,854 $15 $3,854
52,800
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $4,738 $825 $3,779
51,765
kWh
$960
-
kW-mo/yr
- -
04 2.7132: Install timers on light switches in little used areas $751 $243 $751
10,291
kWh
- - -
05 2.2511: Insulate bare equipment $118 $264 - - $118
-
MMBtu
-
TOTAL RECOMMENDED $40,905 $32,697 $13,325
182,532
kWh
$2,558
-
kW-mo/yr
$118
-
MMBtu
$24,905
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs