Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Reconstituted wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0621 #09 Y:2026 Install compressor air intakes in coolest locations $224 $1,573
AS0621 #08 Y:2026 Conserve energy by efficient use of vending machines $1,381 $547
AS0621 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,673 $516
AS0621 #06 Y:2026 Install timers and/or thermostats $1,823 $1,826
AS0621 #05 Y:2026 Turn off equipment when not in use $1,828 $62
AS0621 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,939 $11,910
AS0621 #03 Y:2026 Utilize controls to operate equipment only when needed $3,915 $2,204
AS0621 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,397 $7,852
AS0621 #01 Y:2026 Upgrade obsolete equipment $81,446 $350,000
WM0252 #05 Y:2025 Reduce space conditioning during non-working hours $399 $3,550
WM0252 #04 Y:2025 Install compressor air intakes in coolest locations $566 $3,607
WM0252 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $692 -
WM0252 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,152 $4,060
WM0252 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,906 $17,664
UD1107 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,839 $5,280
UD1107 #04 Y:2025 Eliminate or reduce compressed air usage $412 $900
UD1107 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $953
UD1107 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $69,274 -
UD1107 #01 Y:2025 Optimize plant power factor $228,685 $136,500
SJ0020 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $2,868 $15,989