215
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Reconstituted wood product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0621 #09 Y:2026 | 09 | 2026 | Install compressor air intakes in coolest locations | $224 | $1,573 |
n/a
|
| AS0621 #08 Y:2026 | 08 | 2026 | Conserve energy by efficient use of vending machines | $1,381 | $547 |
n/a
|
| AS0621 #07 Y:2026 | 07 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,673 | $516 |
n/a
|
| AS0621 #06 Y:2026 | 06 | 2026 | Install timers and/or thermostats | $1,823 | $1,826 |
n/a
|
| AS0621 #05 Y:2026 | 05 | 2026 | Turn off equipment when not in use | $1,828 | $62 |
n/a
|
| AS0621 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $2,939 | $11,910 |
n/a
|
| AS0621 #03 Y:2026 | 03 | 2026 | Utilize controls to operate equipment only when needed | $3,915 | $2,204 |
n/a
|
| AS0621 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $5,397 | $7,852 |
n/a
|
| AS0621 #01 Y:2026 | 01 | 2026 | Upgrade obsolete equipment | $81,446 | $350,000 |
n/a
|
| WM0252 #05 Y:2025 | 05 | 2025 | Reduce space conditioning during non-working hours | $399 | $3,550 | |
| WM0252 #04 Y:2025 | 04 | 2025 | Install compressor air intakes in coolest locations | $566 | $3,607 | |
| WM0252 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $692 | - | |
| WM0252 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $1,152 | $4,060 | |
| WM0252 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,906 | $17,664 | |
| UD1107 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,839 | $5,280 | |
| UD1107 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $412 | $900 | |
| UD1107 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,345 | $953 | |
| UD1107 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $69,274 | - | |
| UD1107 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $228,685 | $136,500 | |
| SJ0020 #08 Y:2024 | 08 | 2024 | Replace fossil fuel equipment with electrical equipment | $2,868 | $15,989 |