ITAC Assessment: LT8405
ITAC logo
ITAC Assessment: LT8405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Packaged wood shavings
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 515,000
ft2
Annual Production 70,000
units
Production Hrs. Annual 6,880
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,978 3,136,863
kWh
Electricity Demand $103,782 9,064
kW-mo/yr
LPG $6,305 1,042
MMBtu
Fuel Oil #1 $87,691 3,477
MMBtu
Waste Disposal Costs
Water Usage $3,066 285
Tgal
Water Disposal $3,566 285
Tgal
TOTAL YEARLY COSTS $424,387
RECOMMENDED SAVINGS* $48,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $3,869 $6,130 $2,979
42,501
kWh
$889
-
kW-mo/yr
- - -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,646 $48,894 - - $(-12,597.6)
-
MMBtu
$(-12,206.0) $39,450
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $29,983 $78,432 $(-429.0)
(-6,120)
kWh
- - - $30,413
TOTAL RECOMMENDED $48,498 $133,456 $2,550
36,381
kWh
$889
-
kW-mo/yr
$(-12,597.6)
-
MMBtu
$(-12,206.0) $69,863
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs