ITAC Assessment: HO0138
ITAC logo
ITAC Assessment: HO0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal doors and frames
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 165,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,087 1,859,613
kWh
Electricity Demand $73,638 7,949
kW-mo/yr
Electricity Fees $(-20,768.0) -
Natural Gas $76,609 18,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,476 $48,874 $10,254
116,940
kWh
$5,222
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $562 $1,215 $562
6,448
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,943 $800 $1,291
14,654
kWh
$652
-
kW-mo/yr
-
04 3.2124: Convert to air assisted / airless paint guns $1,500 $2,000 - - $1,500
-
gal
TOTAL RECOMMENDED $19,481 $52,889 $12,107
138,042
kWh
$5,874
-
kW-mo/yr
$1,500
-
gal
TOTAL IMPLEMENTED $17,981 $50,889 $12,107
138,042
kWh
$5,874
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs