ITAC Assessment: BD0291
ITAC logo
ITAC Assessment: BD0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 70,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,075 13,896,010
kWh
Electricity Demand $284,425 26,142
kW-mo/yr
Electricity Fees $88,446 -
Natural Gas $36,440 2,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3113: Make ice during off peak hours for cooling $126,274 $320,000 - $126,274
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $18,984 $17,000 - - $18,984
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,444 $2,886 $7,491
263,754
kWh
$3,953
-
kW-mo/yr
- - -
04 2.2625: Chill water to the highest temperature possible $11,415 $13,500 $6,703
236,013
kWh
$4,712
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $7,030 $2,850 $4,142
145,641
kWh
$2,888
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $6,678 $1,000 $3,379
118,984
kWh
$3,299
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $4,582 $11,250 - - $4,582
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $3,134 $2,200 $1,632
57,461
kWh
$1,502
-
kW-mo/yr
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,677 - $1,754
61,766
kWh
$923
-
kW-mo/yr
- - -
10 2.7231: Use radiant heater for spot heating $2,257 $2,500 $1,478
52,041
kWh
$779
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,162 $2,000 $1,109
39,069
kWh
$1,053
-
kW-mo/yr
- - -
12 2.7135: Install occupancy sensors $1,620 $2,000 - - $1,620
-
MMBtu
- -
13 4.821: Pay bills on time to avoid late fees $3,744 $2,500 - - - $3,744 -
14 4.447: Automate payroll system $2,950 - - - - - $2,950
TOTAL RECOMMENDED $204,951 $379,686 $27,688
974,729
kWh
$145,383
-
kW-mo/yr
$25,186
-
MMBtu
$3,744 $2,950
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs