Assessment Year | 2024 |
---|---|
Principal Product | Wood shavings for ag/pet and industrial wood flour |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 34 |
Plant Area |
38,000
ft2
|
Annual Production | 38,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,750 | 2,451,284 |
kWh
|
$0.16 |
Electricity Demand | $238,090 | 5,071 |
kW-mo/yr
|
$46.95 |
LPG | $21,044 | 659 |
MMBtu
|
$31.96 |
TOTAL YEARLY COSTS | $646,884 | |||
RECOMMENDED SAVINGS* | $174,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $140,348 | $663,784 |
$139,104
879,392
kWh
|
$1,244
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,898 | $9,577 |
$16,195
102,382
kWh
|
$7,703
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $156 | $358 |
$106
671
kWh
|
$50
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $178 | $770 |
$68
432
kWh
|
$110
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,344 | - |
$867
5,483
kWh
|
$477
-
kW-mo/yr
|
- | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,851 | - |
$221
1,394
kWh
|
- | - |
$2,630
-
MMBtu
|
|
07 | 2.1332: Convert combustion equipment to burn natural gas | $2,380 | - | - | - |
$(-3,916.0)
-
MMBtu
|
$6,296
-
MMBtu
|
|
08 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,868 | $15,989 |
$(-1,962.0)
(-12,402)
kWh
|
- | - |
$4,830
-
MMBtu
|
|
TOTAL RECOMMENDED | $174,023 | $690,478 |
$154,599
977,352
kWh
|
$9,584
-
kW-mo/yr
|
$(-3,916.0)
-
MMBtu
|
$13,756
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs