ITAC Assessment: UF0079
ITAC logo
ITAC Assessment: UF0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 70,000
ft2
Annual Production 22,340
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,624 637,456
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,254 $1,557 $2,254
24,619
kWh
02 2.7144: Install spectral reflectors / delamp $924 $1,088 $924
8,792
kWh
03 2.7111: Reduce illumination to minimum necessary levels $279 - $279
3,810
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $362 $360 $362
3,517
kWh
05 2.4133: Use most efficient type of electric motors $813 $1,902 $813
8,792
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,331 - $1,331
-
kWh
TOTAL RECOMMENDED $5,963 $4,907 $5,963
49,530
kWh
TOTAL IMPLEMENTED $4,509 $2,645 $4,509
33,411
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs