ITAC Assessment: UF0099
ITAC logo
ITAC Assessment: UF0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 37,500
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 5,950
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,825 2,327,081
kWh
Other Energy $30,406 4,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,610 $5,358 $2,610
38,687
kWh
-
02 2.7135: Install occupancy sensors $165 $228 $165
3,810
kWh
-
03 2.4133: Use most efficient type of electric motors $3,247 $1,883 $3,247
51,583
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,087 $1,100 $3,087
48,945
kWh
-
05 2.4226: Use / purchase optimum sized compressor $496 $1,200 $496
5,862
kWh
-
06 4.631: Install an uninteruptable power supply $100,000 $8,200 - $100,000
07 2.2136: Install / repair insulation on steam lines $499 $244 $499
20,809
kWh
-
TOTAL RECOMMENDED $110,104 $18,213 $10,104
169,696
kWh
$100,000
TOTAL IMPLEMENTED $8,944 $8,341 $8,944
139,215
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs