ITAC Assessment: TA0089
ITAC logo
ITAC Assessment: TA0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 160,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 8,592
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,319,693 32,459,284
kWh
Electricity Demand $267,342 55,192
kW-mo/yr
Electricity Fees $5,768 -
Natural Gas $427,895 75,701
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $148,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1211: Move boiler to more efficient location $87,420 $4,860 - - $87,420
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $45,060 $540 $37,900
929,390
kWh
$7,160
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $10,000 $3,200 - - $10,000
-
MMBtu
04 2.2212: Use minimum safe oven ventilation $1,890 $1,500 - - $1,890
-
MMBtu
05 2.7124: Make a practice of turning off lights when not needed $3,740 - $3,740
91,610
kWh
- -
TOTAL RECOMMENDED $148,110 $10,100 $41,640
1,021,000
kWh
$7,160
-
kW-mo/yr
$99,310
-
MMBtu
TOTAL IMPLEMENTED $148,110 $10,100 $41,640
1,021,000
kWh
$7,160
-
kW-mo/yr
$99,310
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs