Assessment Year | 2025 |
---|---|
Principal Product | Titanium components for aerospace systems |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 207 |
Plant Area |
180,600
ft2
|
Annual Production | 1,148,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $577,047 | 14,426,178 |
kWh
|
$0.040 | |
Electricity Demand | $652,074 | 28,650 |
kW-mo/yr
|
$22.76 | |
Electricity Fees | $97,357 | - |
|
- | |
Natural Gas | $77,547 | 20,142 |
MMBtu
|
$3.85 | |
Waste Disposal Costs | |||||
Water Usage | $299,855 | 18,485 |
Tgal
|
$16.22 | |
TOTAL YEARLY COSTS | $1,703,880 | ||||
RECOMMENDED SAVINGS* | $48,639 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $1,449 | - |
$1,449
36,218
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,811 | $2,884 |
$9,811
245,280
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,561 | $1,950 |
$3,561
89,046
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $1,934 | $20 | - |
$1,934
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,058 | $132,837 |
$27,058
674,937
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $488 | $653 |
$488
12,212
kWh
|
- | |
07 | 2.6231: Utilize controls to operate equipment only when needed | $4,338 | $893 |
$4,338
108,449
kWh
|
- | |
TOTAL RECOMMENDED | $48,639 | $139,237 |
$46,705
1,166,142
kWh
|
$1,934
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs