ITAC Assessment: UL2403
ITAC logo
ITAC Assessment: UL2403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Pet Bedding
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 250,000
ft2
Annual Production 64,067
ton
Production Hrs. Annual 7,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,320 7,419,760
kWh
Electricity Demand $423,563 20,773
kW-mo/yr
Electricity Fees $139,961 -
Natural Gas $400,772 74,556
MMBtu
TOTAL YEARLY COSTS $1,217,616
RECOMMENDED SAVINGS* $137,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $35,606 $77,327 - - - $35,606
-
MMBtu
02 2.3212: Optimize plant power factor $32,359 $12,025 - - $32,359 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,407 $9,750 $3,407
99,784
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,803 - $1,803
52,827
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,498 $1,785 $4,498
131,759
kWh
- - -
06 2.7135: Install occupancy sensors $181 $779 $181
5,309
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,568 $3,839 $2,845
83,319
kWh
$2,723
-
kW-mo/yr
- -
08 2.7144: Install spectral reflectors / delamp $680 - $294
8,601
kWh
$386
-
kW-mo/yr
- -
09 2.9114: Use solar heat to make electricty $53,533 $548,395 $24,521
718,252
kWh
$29,012
-
kW-mo/yr
- -
TOTAL RECOMMENDED $137,635 $653,900 $37,549
1,099,851
kWh
$32,121
-
kW-mo/yr
$32,359 $35,606
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs