ITAC Assessment: KU0409
ITAC logo
ITAC Assessment: KU0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Metal Ductwork
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 570,000
lb
Production Hrs. Annual 3,540
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,525 148,300
kWh
Natural Gas $4,304 1,630
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $1,324 $264 - $1,324
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $407 - $223
4,396
kWh
$184
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $476 $2,430 $476
9,379
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $382 $559 $382
4,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $410 $346
4,103
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $104 $30 $104
2,052
kWh
-
TOTAL RECOMMENDED $3,039 $3,693 $1,531
24,326
kWh
$1,508
-
MMBtu
TOTAL IMPLEMENTED $3,039 $3,693 $1,531
24,326
kWh
$1,508
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs