ITAC Assessment: BS0147
ITAC logo
ITAC Assessment: BS0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Linens
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 3,650
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,529 2,668,579
kWh
Electricity Demand $45,474 9,027
kW-mo/yr
Natural Gas $157,047 48,361
MMBtu
TOTAL YEARLY COSTS $328,050
RECOMMENDED SAVINGS* $14,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,246 $7,983 $923
19,622
kWh
$323
-
kW-mo/yr
- -
02 4.441: Install automatic packing equipment $10,717 $50,361 - - - $10,717
03 2.7135: Install occupancy sensors $386 $882 $386
8,212
kWh
- - -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $1,755 - - - $1,755
-
lb
-
TOTAL RECOMMENDED $14,104 $59,226 $1,309
27,834
kWh
$323
-
kW-mo/yr
$1,755
-
lb
$10,717
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs