| Assessment Year | 2025 |
|---|---|
| Principal Product | Wood Shavings, Wood Flour, Pet Bedding |
| NAICS | 321219: Reconstituted Wood Product Manufacturing |
| SIC | 2493: Reconstituted Wood Products |
| Sales Range | $10 M to 50M |
| # of Employees | 37 |
| Plant Area |
90,000
ft2
|
| Annual Production | 78,924
ton
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $958,922 | 13,238,400 |
kWh
|
$0.072 | |
| Electricity Demand | $190,891 | 30,157 |
kW-mo/yr
|
$6.33 | |
| Electricity Fees | $24,347 | - |
|
- | |
| Natural Gas | $14,882 | 1,178 |
MMBtu
|
$12.63 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,499 | 771 |
Tgal
|
$8.43 | |
| Water Disposal | $7,990 | 687 |
Tgal
|
$11.63 | |
| Other Liquid (non-haz) | $2,265 | 1 |
gal
|
$2,265.00 | |
| TOTAL YEARLY COSTS | $1,205,796 | ||||
| RECOMMENDED SAVINGS* | $302,555 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $228,685 | $136,500 | - | - | $22,685 | - | - | $206,000 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $69,274 | - | - |
$69,274
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,345 | $953 |
$1,180
16,293
kWh
|
$165
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $412 | $900 |
$345
4,761
kWh
|
$67
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,839 | $5,280 |
$1,433
19,788
kWh
|
$201
-
kW-mo/yr
|
- | $1,095 | $110 | - | |
| TOTAL RECOMMENDED | $302,555 | $143,633 |
$2,958
40,842
kWh
|
$69,707
-
kW-mo/yr
|
$22,685 | $1,095 | $110 | $206,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs