ITAC Assessment: DS0174
ITAC logo
ITAC Assessment: DS0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pump, switches, and alarms
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 60,800
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 4,654
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,135 1,522,274
kWh
Electricity Demand $3,836 672
kW-mo/yr
Electricity Fees $6,145 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7314: Reduce ventilation air $8,393 $4,500 $8,393
299,824
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $403 $238 $403
14,361
kWh
-
03 2.7135: Install occupancy sensors $300 $540 $300
10,844
kWh
-
04 4.446: Automate finishing process $45,038 $6,995 - $45,038
05 4.611: Begin a practice of predictive / preventative maintenance $365 - - $365
TOTAL RECOMMENDED $54,499 $12,273 $9,096
325,029
kWh
$45,403
TOTAL IMPLEMENTED $54,499 $12,273 $9,096
325,029
kWh
$45,403
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs