Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Truss manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0515 #08 Y:2021 Install occupancy sensors $1,832 $3,388
AS0515 #07 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,242 $7,928
AS0515 #06 Y:2021 Apply for tax-free status for energy purchases $27,420 $500
AS0515 #05 Y:2021 Use solar heat to make electricty $6,571 $72,520
AS0515 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $18,528 $28,033
AS0515 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $21,340 $9,935
AS0515 #02 Y:2021 Replace fossil fuel equipment with electrical equipment $30,224 $146,764
AS0515 #01 Y:2021 Increase amount of waste recovered for resale $125,792 $20,098
UA0230 #06 Y:2020 Utilize energy-efficient belts and other improved mechanisms $116 $100
UA0230 #05 Y:2020 Install occupancy sensors $546 $546
UA0230 #04 Y:2020 Lower temperature during the winter season and vice-versa $229 $50
UA0230 #03 Y:2020 Reduce space conditioning during non-working hours $928 $221
UA0230 #02 Y:2020 Reduce the pressure of compressed air to the minimum required $1,204 $50
UA0230 #01 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,808 $1,868
CO0657 #05 Y:2012 Use solar heat to make electricty $2,460 $35,000
CO0657 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $460 $510
CO0657 #03 Y:2012 Install timers and/or thermostats $460 -
CO0657 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $350
CO0657 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $24,210 $77,390
BD0337 #05 Y:2007 Reduce the pressure of compressed air to the minimum required $926 $2