ITAC Assessment: CO0657
ITAC logo
ITAC Assessment: CO0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Finished lumber and roof trusses
NAICS 321214: Truss Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 83
Plant Area 55,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,109 833,589
kWh
Electricity Demand $89,608 4,409
kW-mo/yr
Electricity Fees $533 -
Natural Gas $38,282 5,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,210 $77,390 $7,870
196,700
kWh
$16,340
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $350 $980
24,500
kWh
$1,860
-
kW-mo/yr
- - - -
03 2.7261: Install timers and/or thermostats $460 - - - $460
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $510 $400
10,000
kWh
- - $30 - $30
05 2.9114: Use solar heat to make electricty $2,460 $35,000 $560
14,100
kWh
$630
-
kW-mo/yr
- - $1,270 -
TOTAL RECOMMENDED $30,430 $113,250 $9,810
245,300
kWh
$18,830
-
kW-mo/yr
$460
-
MMBtu
$30 $1,270 $30
TOTAL IMPLEMENTED $3,300 $350 $980
24,500
kWh
$1,860
-
kW-mo/yr
$460
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs