41
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Engineered wood member (except truss) manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0628 #07 Y:2014 | 07 | 2014 | Use / purchase optimum sized compressor | $9,718 | $2,460 | |
| OR0628 #06 Y:2014 | 06 | 2014 | Upgrade conveyors | $20,000 | $11,206 | |
| OR0628 #05 Y:2014 | 05 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,875 | $1,293 | |
| OR0628 #04 Y:2014 | 04 | 2014 | Replace existing equipment with more suitable substitutes | $25,006 | $4,810 | |
| OR0628 #03 Y:2014 | 03 | 2014 | Pay bills on time to avoid late fees | $3,198 | - | |
| OR0628 #02 Y:2014 | 02 | 2014 | Use optimum thickness insulation | $3,869 | $828 | |
| OR0628 #01 Y:2014 | 01 | 2014 | Replace electrically-operated equipment with fossil fuel equipment | $44,216 | $17,353 | |
| OR0582 #04 Y:2012 | 04 | 2012 | Redesign flow to minimize mass transfer length | $14,435 | $34,000 | |
| OR0582 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $11,291 | $23,135 | |
| OR0582 #02 Y:2012 | 02 | 2012 | Upgrade controls on compressors | $25,857 | $33,400 | |
| OR0582 #01 Y:2012 | 01 | 2012 | Establish burner maintenance schedule for boilers | $720 | $500 | |
| OR0554 #05 Y:2009 | 05 | 2009 | Install direct acting units in place of compressed air pressure system in safety system | $6,200 | $1,900 | |
| OR0554 #04 Y:2009 | 04 | 2009 | Reduce fluid flow rates | $6,442 | $6,442 | |
| OR0554 #03 Y:2009 | 03 | 2009 | Upgrade controls on compressors | $13,900 | $1,500 | |
| OR0554 #02 Y:2009 | 02 | 2009 | Reduce combustion air flow to optimum | $1,667 | $700 | |
| OR0554 #01 Y:2009 | 01 | 2009 | Train operators for maximum operating efficiency | $33,705 | - | |
| MS0307 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $327 | $3,053 | |
| MS0307 #04 Y:2006 | 04 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $677 | $3,300 | |
| MS0307 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,621 | $156 | |
| MS0307 #02 Y:2006 | 02 | 2006 | Use radiant heater for spot heating | $8,652 | $7,384 |