Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Engineered wood member (except truss) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0628 #07 Y:2014 Use / purchase optimum sized compressor $9,718 $2,460
OR0628 #06 Y:2014 Upgrade conveyors $20,000 $11,206
OR0628 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,875 $1,293
OR0628 #04 Y:2014 Replace existing equipment with more suitable substitutes $25,006 $4,810
OR0628 #03 Y:2014 Pay bills on time to avoid late fees $3,198 -
OR0628 #02 Y:2014 Use optimum thickness insulation $3,869 $828
OR0628 #01 Y:2014 Replace electrically-operated equipment with fossil fuel equipment $44,216 $17,353
OR0582 #04 Y:2012 Redesign flow to minimize mass transfer length $14,435 $34,000
OR0582 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $11,291 $23,135
OR0582 #02 Y:2012 Upgrade controls on compressors $25,857 $33,400
OR0582 #01 Y:2012 Establish burner maintenance schedule for boilers $720 $500
OR0554 #05 Y:2009 Install direct acting units in place of compressed air pressure system in safety system $6,200 $1,900
OR0554 #04 Y:2009 Reduce fluid flow rates $6,442 $6,442
OR0554 #03 Y:2009 Upgrade controls on compressors $13,900 $1,500
OR0554 #02 Y:2009 Reduce combustion air flow to optimum $1,667 $700
OR0554 #01 Y:2009 Train operators for maximum operating efficiency $33,705 -
MS0307 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $327 $3,053
MS0307 #04 Y:2006 Utilize energy-efficient belts and other improved mechanisms $677 $3,300
MS0307 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $4,621 $156
MS0307 #02 Y:2006 Use radiant heater for spot heating $8,652 $7,384