Assessment Year | 2014 |
---|---|
Principal Product | moulding |
NAICS | 321213: Engineered Wood Member (except Truss) Manufacturing |
SIC | 2431: Millwork |
Sales Range | $1 M to 5M |
# of Employees | 34 |
Plant Area |
65,000
ft2
|
Annual Production | 150,000
units
|
Production Hrs. Annual | 1,550
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,194 | 1,573,920 |
kWh
|
$0.055 |
Electricity Demand | $86,289 | 10,526 |
kW-mo/yr
|
$8.20 |
Electricity Fees | $20,550 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $110,707 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,718 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $44,216 | $17,353 |
$35,615
643,770
kWh
|
$26,854
-
kW-mo/yr
|
$(-20,003.0)
-
MMBtu
|
- | - | $1,750 | |
02 | 2.2515: Use optimum thickness insulation | $3,869 | $828 |
$3,869
70,004
kWh
|
- | - | - | - | - | |
03 | 4.821: Pay bills on time to avoid late fees | $3,198 | - | - | - | - | - | $3,198 | - | |
04 | 4.652: Replace existing equipment with more suitable substitutes | $25,006 | $4,810 |
$9,372
169,411
kWh
|
$15,634
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,875 | $1,293 |
$1,043
18,860
kWh
|
$1,334
-
kW-mo/yr
|
- | - | $49 | $449 | |
06 | 2.4325: Upgrade conveyors | $20,000 | $11,206 | - | - | - | $20,000 | - | - | |
07 | 2.4226: Use / purchase optimum sized compressor | $9,718 | $2,460 |
$9,718
175,729
kWh
|
- | - | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $877 | $500 |
$527
9,532
kWh
|
$350
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $948 | $676 |
$1,126
20,362
kWh
|
$(-178.0)
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $110,707 | $39,126 |
$61,270
1,107,668
kWh
|
$43,994
-
kW-mo/yr
|
$(-20,003.0)
-
MMBtu
|
$20,000 | $3,247 | $2,199 | ||
TOTAL IMPLEMENTED | $9,718 | $2,460 |
$9,718
175,729
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs