ITAC Assessment: OR0628
ITAC logo
ITAC Assessment: OR0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product moulding
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 65,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 1,550
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,194 1,573,920
kWh
Electricity Demand $86,289 10,526
kW-mo/yr
Electricity Fees $20,550 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $44,216 $17,353 $35,615
643,770
kWh
$26,854
-
kW-mo/yr
$(-20,003.0)
-
MMBtu
- - $1,750
02 2.2515: Use optimum thickness insulation $3,869 $828 $3,869
70,004
kWh
- - - - -
03 4.821: Pay bills on time to avoid late fees $3,198 - - - - - $3,198 -
04 4.652: Replace existing equipment with more suitable substitutes $25,006 $4,810 $9,372
169,411
kWh
$15,634
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,875 $1,293 $1,043
18,860
kWh
$1,334
-
kW-mo/yr
- - $49 $449
06 2.4325: Upgrade conveyors $20,000 $11,206 - - - $20,000 - -
07 2.4226: Use / purchase optimum sized compressor $9,718 $2,460 $9,718
175,729
kWh
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $877 $500 $527
9,532
kWh
$350
-
kW-mo/yr
- - - -
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $948 $676 $1,126
20,362
kWh
$(-178.0)
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $110,707 $39,126 $61,270
1,107,668
kWh
$43,994
-
kW-mo/yr
$(-20,003.0)
-
MMBtu
$20,000 $3,247 $2,199
TOTAL IMPLEMENTED $9,718 $2,460 $9,718
175,729
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs