ITAC Assessment: OR0554
ITAC logo
ITAC Assessment: OR0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product I-Joists, LVL
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 740,000
ft2
Annual Production 375,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,214 11,325,600
kWh
Electricity Demand $102,541 33,954
kW-mo/yr
Electricity Fees $22,494 -
Natural Gas $8,649 34,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 4.431: Train operators for maximum operating efficiency $33,705 - - - $33,705
02 2.1113: Reduce combustion air flow to optimum $1,667 $700 - $1,667
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $13,900 $1,500 $13,900
308,000
kWh
- -
04 2.5123: Reduce fluid flow rates $6,442 $6,442 $6,442
206,296
kWh
- -
05 2.4223: Install direct acting units in place of compressed air pressure system in safety system $6,200 $1,900 $6,200
147,000
kWh
- -
TOTAL RECOMMENDED $61,914 $10,542 $26,542
661,296
kWh
$1,667
-
MMBtu
$33,705
TOTAL IMPLEMENTED $54,047 $7,942 $20,342
514,296
kWh
- $33,705
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs