| Assessment Year | 2022 |
|---|---|
| Principal Product | Jet Fuel Filter |
| NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 71 |
| Plant Area |
125,000
ft2
|
| Annual Production | 360,000
units
|
| Production Hrs. Annual | 2,958
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,261 | 1,449,280 |
kWh
|
$0.047 |
| Electricity Demand | $40,629 | 4,170 |
kW-mo/yr
|
$9.74 |
| Electricity Fees | $7,316 | - |
|
- |
| Natural Gas | $43,411 | 5,735 |
MMBtu
|
$7.57 |
| TOTAL YEARLY COSTS | $159,617 | |||
| RECOMMENDED SAVINGS* | $28,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,977 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,396 | $17,269 |
$2,865
60,833
kWh
|
$2,407
-
kW-mo/yr
|
$124 | - | |
| 02 | 2.7231: Use radiant heater for spot heating | $15,788 | $20,165 | - | - | - |
$15,788
-
MMBtu
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $320 | $20 |
$313
6,652
kWh
|
- | $7 | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,213 | $100 |
$1,238
26,292
kWh
|
$924
-
kW-mo/yr
|
$51 | - | |
| 05 | 2.2437: Recover waste heat from equipment | $5,261 | $8,080 | - | - | - |
$5,261
-
MMBtu
|
|
| TOTAL RECOMMENDED | $28,978 | $45,634 |
$4,416
93,777
kWh
|
$3,331
-
kW-mo/yr
|
$182 |
$21,049
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,977 | $25,369 |
$3,178
67,485
kWh
|
$2,407
-
kW-mo/yr
|
$131 |
$5,261
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs