ITAC Assessment: UA0249
ITAC logo
ITAC Assessment: UA0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Jet Fuel Filter
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 125,000
ft2
Annual Production 360,000
units
Production Hrs. Annual 2,958
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,261 1,449,280
kWh
Electricity Demand $40,629 4,170
kW-mo/yr
Electricity Fees $7,316 -
Natural Gas $43,411 5,735
MMBtu
TOTAL YEARLY COSTS $159,617
RECOMMENDED SAVINGS* $28,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,396 $17,269 $2,865
60,833
kWh
$2,407
-
kW-mo/yr
$124 -
02 2.7231: Use radiant heater for spot heating $15,788 $20,165 - - - $15,788
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $320 $20 $313
6,652
kWh
- $7 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,213 $100 $1,238
26,292
kWh
$924
-
kW-mo/yr
$51 -
05 2.2437: Recover waste heat from equipment $5,261 $8,080 - - - $5,261
-
MMBtu
TOTAL RECOMMENDED $28,978 $45,634 $4,416
93,777
kWh
$3,331
-
kW-mo/yr
$182 $21,049
-
MMBtu
TOTAL IMPLEMENTED $10,977 $25,369 $3,178
67,485
kWh
$2,407
-
kW-mo/yr
$131 $5,261
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs